Home > News > International News > Chinese-funded youth center st.....
Certifications
Contact us
Tel: +86-28- 8519 8642
Fax: +86-28-8593 8404
Email: sales@onekingroup.comContact Now
Project
Another Advantage: Lightweight

Another Advantage: Lightweight

The lightweight panel with tongue and groove design enables 3-5times faster installation compared with that of cement panel, or bricks.
The panels can be easily sawn, cut, drilled and taped. One skilled worker can install about 40m2 per day.

What is Onekin MgO Wall Panel?

What is Onekin MgO Wall Panel?

Certificate: TUV / ASTM / SGS / IS09001
Fire Rated:  Upto 164mins
Fast Installation: 40m2/day/worker
Lightweight: 36kg/m2 for 90mm panel
Thermal Transmission: 0.0349w/m.k
Sound Insulation: 51dB

high rise

high rise

Vietnam Project Local Conditions Location: Vietnam    Temperature: 15℃~35℃ Humidity: 50--100% Project Type: high rise building - steel structure Pro...

low rise

low rise

Singapore Project Local Conditions Location: Singapore   Temperature: 23℃~34℃ Humidity: 60% ~ 90% Project Type: low rise building - steel structure ...

Steel structure

Steel structure

Oman ProjectLocal Conditions Location: Oman (Middle East) Temperature: 15℃~47℃ Humidity: above 50% Local material: AAC block Project Type: low rise ...

Fireproof board for villas

Fireproof board for villas

Onekin green board is a fire proof and a thermal insulation building material.
It's raw materials include magnesium oxide, magnesium chloride, fiberglass mesh, non-woven fabric etc. lt can be used for interior or exterior applications in residential house, villa, sound studios, schools, public areas, movie theater, shopping centers and any area where the fireproof function required.

Customers Feedback

Customers Feedback

Onekin green precast wall system with high quality, reasonable price has win our customers’ trust and gets the thumbs-up. In this part, we will share...

News

Chinese-funded youth center starts construction near Tunisian Capital


The groundbreaking ceremony of a Chinese-funded youth cultural center was held on Wednesday near the Tunisian capital of Tunis, just after Tunisian Prime Minister Youssef Chahed approved its construction.

The ceremony in Ben Arous city in the southern suburbs of Tunis was attended by Chinese Ambassador to Tunisia Wang Wenbin, Tunisian Minister of Youth and Sports Sonia Ben Cheikh and other senior officials.
The management of the project will be provided by the Agency for International Economic Cooperation and two Chinese groups specializing in the field.

Covering a total area of 22,000 square meters, Ben Arous Youth Cultural and Sports Center will include a swimming pool, gymnasiums, multidisciplinary sports centers, accommodation centers, changing rooms for outdoor courts, administrative buildings and auditoriums.

The project is funded by a Chinese donation of 104 million dinars (36.2 million U.S. dollars) with an expected construction period of 26 months.