Home > News > Industry News > Work starts on Dubai’s Meydan .....
Certifications
Contact us
Tel: +86-28- 8519 8642
Fax: +86-28-8593 8404
Email: sales@onekingroup.comContact Now
Project
high rise

high rise

Vietnam Project Local Conditions Location: Vietnam    Temperature: 15℃~35℃ Humidity: 50--100% Project Type: high rise building - steel structure Pro...

low rise

low rise

Singapore Project Local Conditions Location: Singapore   Temperature: 23℃~34℃ Humidity: 60% ~ 90% Project Type: low rise building - steel structure ...

Steel structure

Steel structure

Oman ProjectLocal Conditions Location: Oman (Middle East) Temperature: 15℃~47℃ Humidity: above 50% Local material: AAC block Project Type: low rise ...

Fireproof board for villas

Fireproof board for villas

Onekin green board is a fire proof and a thermal insulation building material.
It's raw materials include magnesium oxide, magnesium chloride, fiberglass mesh, non-woven fabric etc. lt can be used for interior or exterior applications in residential house, villa, sound studios, schools, public areas, movie theater, shopping centers and any area where the fireproof function required.

Customers Feedback

Customers Feedback

Onekin green precast wall system with high quality, reasonable price has win our customers’ trust and gets the thumbs-up. In this part, we will share...

Another Advantage: Lightweight

Another Advantage: Lightweight

The lightweight panel with tongue and groove design enables 3-5times faster installation compared with that of cement panel, or bricks.
The panels can be easily sawn, cut, drilled and taped. One skilled worker can install about 40m2 per day.

What is Onekin MgO Wall Panel?

What is Onekin MgO Wall Panel?

Certificate: TUV / ASTM / SGS / IS09001
Fire Rated:  Upto 164mins
Fast Installation: 40m2/day/worker
Lightweight: 36kg/m2 for 90mm panel
Thermal Transmission: 0.0349w/m.k
Sound Insulation: 51dB

News

Work starts on Dubai’s Meydan One Mall

  • Author:Staff Writer
  • Source:meconstructionnews
  • Release on :2017-03-17
Construction works have begun at the Meydan One Mall in Dubai, part of a wider mega development that is set to break several world records.

Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai, officially launched the groundbreaking of the development, the state news agency WAM said.

The mall will be the central point of the wider Meydan One mega development.

It will feature 620 retail shops including two major department stores and a 131,150 square foot hypermarket, and “smart” features including a retractable skylight.

“With construction now underway, the Meydan One Mall is scheduled to be completed by 2020, in line with phase 1 of the Meydan One mega development,” said Meydan Chairman Saeed Humaid Al Tayer.

The mall will also include what is billed as the largest dancing water fountain in the world, measuring 380m long, a 1km indoor ski slope, and a 258,300 square foot indoor multi-purpose sports facility.

The wider 40.4 million square foot Meydan One development, located between Meydan and Al Khail Road, “is set to become Dubai’s number one attraction when the first phase opens in 2020,” a statement said.

Is is set to be home to more than 83,000 residents, and break at least seven world records and feature the 711m tall Dubai One tower.

All above news souce from meconstructionnews.Onekin  cheers this breakout,as a wall panel material supplier we would like to contribute to this project and delivery quality products and services.

Onekin precast panel,faster,easier,heathier - quality and cost effective solutions